Winston-Salem Infrastructure Development Standards
These documents are in Adobe Reader format go to the Adobe web site to get the free Adobe Reader
COVER-INTRODUCTION
TABLE OF CONTENTS
SECTION I GENERAL INFORMATION
Infrastructure Development List of Contacts 1 Flowchart of Typical Infrastructure Construction Plan Review Process 2 Flowchart of Platting Process 3 Flowchart of Record Drawings/Street Acceptance Process 4 Flowchart of Street/Alley Closure Process 5
SECTION II ADMINISTRATIVE REQUIREMENTS
Preliminary Site Plan checklists 1-4 Erosion and Sedimentation Control Plan Checklist. 5-8 Stormwater Management Plan Checklist 9 Gravity Sewer Extension Checklist 10-11 Final Construction Drawing Checklist 12-15 Construction Checklist 16-19 Platting and Posting of Sureties 20-23 Record Drawings Checklist 24-26
SECTION III CONSTRUCTION NOTES
General 1-2 Water and Sanitary 2 Roadway 2-4 Roadway Final Inspection Procedure 4-5
SECTION IV DESIGN STANDARDS
A. Roadway
i. Street Design Matrix 1 ii. Public Streets 2-4 iii. Private Streets & Drainage Systems 4 iv. Storm Sewer 4-6
B. Utilities (Water/Sanitary Sewer Only)
i. General 7-8 ii. Water 8-9 iii. Sewer 9-11
C. Stormwater Management .
i. General 12 ii. Quantity Control 12-13 iii. Quality Control 13-15
SECTION V CONSTRUCTION DETAILS
A. Streets Page(s)
Typical Section For Local Streets and Cul-De-Sacs 1 Typical Street Widening 2
2'-6" Curb and Gutter/Valley Curb and Gutter Detail 3 Transition From Valley C & G to Standard C & G 4 T-Turnaround –Permanent 5 Offset Turnaround-Permanent 6 Valley Curb "T" Turnaround (Temporary) 7 Offset Valley Curb Turnaround (Temporary) 8 Residential Cul-de-sac 9
B. Water/Sewer
Refer to City of Winston Salem Detail Drawings.
SECTION VI PERMITS
The following Documents should be submitted in conjunction with Final Construction
Plans.
A. Water/Sewer Permits
Information Sheet for Water and/or Sanitary Sewer Extension 1 Permit Application for Water and/or Sewer Line Extensions 2
B. Driveway Permits 3
C. Grading Permits 3
D. Right of Way Tree Planting Permits 3
SECTION VII DEVELOPMENT REVIEW FEE SCHEDULE
A. Water and Sewer 1
B. Stormwater Management 1
C. Erosion Control 1-2
D. Other Fees 2
SECTION VIII MISCELLANEOUS DOCUMENTS
A. Water/Sewer
Estimating Sewage Flows for Plant Allocation 1-2 Flow in Vitrified Pipe Sewers Flowing Half Full 3 Sample Format; Cost Breakout 4 Proof of Payment Document 5 Required Signature Blocks 6 Sample Easement 7-9
B. Drainage & Stormwater
Sample Drainage Chart 10 Sample Stormwater Detention Data Sheet 11-12
C. Impact/Acreage Fee Exhibits
Stratford Road Impact Fee/Hanes Mall Blvd Acreage Fee 13 Leak Creek Acreage Fee 14 Lower Abbotts Creek Acreage Fee 15
SECTION IX REFERENCES
|