Sixth Street Closing for Drainage Repairs
Streets - Oct. 10, 2008 Contact: Randy Bullins, 734-1533
The block of Sixth Street between Church and Chestnut streets will be closed to through traffic at 10 a.m. Tuesday, Oct. 14, to repair a drainage pipe under the roadbed. The street is scheduled to be closed until Oct. 24.
A detour will be posted. For more information call City Link at 727-8000.
|