US 52 Phase 2 Final Report CoverUS 52 Phase 2 Transportation Improvements Final Report

US 52 plays a critical role in the transportation system of the City of Winston-Salem and the Piedmont Triad region. This urban freeway passes through downtown Winston-Salem and provides an important link between I-77 to the north and I-40 and I-85 to the south. With increasing congestion and eroding travel conditions, it was recognized that both capacity and safety improvements were needed for the US 52 facility. In response to this need, the US 52 Land Use and Transportation Plan (2004) was conducted which presented design plans for the reconstruction of US 52 to interstate highway standards and recommended strategies for the coordination of this project with the future land use plans along the corridor.

Since the completion of the first phase of the US 52 corridor study, several major development projects have been proposed for the downtown area and the surrounding communities which require further evaluation as to the impacts they will have on the existing and future transportation network. This second phase of study considers the opportunities to better serve area travelers by integrating the proposed reconstruction of the US 52 facility with other planned roadway and transit improvements as well as the major development projects proposed for the Winston-Salem area.

Get Adobe ReaderThese documents require the
Adobe Reader; a free download.

 

US 52 PHASE 2 Transportation Improvements FINAL REPORT

Documents

Cover, Table of Contents, Lists of Tables & Figures [pdf/436kb/4p]
Chapter 1 - Introduction and Project Background [pdf/409kb/3p]
Chapter 2 - Project Description and Purpose [pdf/273kb/2p]
Chapter 3 - Existing Conditions [pdf/3.39mb/25p]
Chapter 4 - Future Land Use Plans [pdf/166kb/7p]
Figure 4-1 - Proposed Major Developments and Activity Centers
Sheet 1 - Northern Section [pdf/219kb/1p]
Sheet 2 - Southern Section [pdf/212kb/1p]
Figure 4-2 - Phase 1 US 52 Land Use and Development Opportunities
Sheet 1 - Southern Section [pdf/5.74mb/1p]
Sheet 2 - Northern Section [pdf/11.9mb/1p]
Chapter 5 - Transportation Plan Initiatives [pdf/454kb/5p]
Chapter 6 - Phase 2 Proposed Transportation Improvements [pdf/430kb/4p]
Chapter 7 - 2030 Travel Demand and Capacity Analysis [pdf/898kb/12p]
Chapter 8 - US 52 Corridor and Streetscape Design Concepts [pdf/3.57mb/22p]