Department of Transportation

"Enhancing Mobility, Improving the Journey"

The Transportation department has a focus on moving people and goods safely and efficiently on the surface transportation system in Winston-Salem and Forsyth County. We aspire to plan, design, construct, operate and maintain our system so that congestion, delay and traffic accidents are minimized while transportation choices and emergency services are maximized.

Transportation Updates

June 2014 Transportation Planning Documents Review

The Winston-Salem Urban Area Metropolitan Planning Organization (MPO) released several documents for public review from June 12 - July 11, 2014. The documents include Strategic Transportation Investments (STI) projects and Draft STI Local Input Point Assignments, Metropolitan Transportation Improvement Program (MTIP) Amendments and Modifications for June 2014, and project U-2827B (I-40 Business) Air Quality Conformity Document Short Form. See the documents. 

Urban Circulator Draft Alternative Analysis Report

The final draft of the Urban Circulator Alternative Analysis Report has been produced, and is now going before City Council for consideration. Find out more about the Urban Circulator Study. 

New Winston-Salem Urban Area MPO Boundary

The new Metropolitan Area Boundary (MAB) and Smoother Urbanized Area Boundary (UAB) for the Winston-Salem Urban Area Metropolitan Planning Organization (MPO) based on the 2010 United States Census have been approved by the State of North Carolina. See the new boundaries on the MPO web page. 

Project Updates

  • Union Cross Road Project
    • Silver Creek Trail at the intersection of Union Cross Road will be permanently closed as of July 23, 2014. Silver Creek Trail will be barricaded in the short term until the cul-de-sac can be installed in the coming months per the project plans. Three portable message signs have been placed on site near the intersection to advise area residents of the closure.
  • Salem Creek Greenway Detour
    • The portion of the Salem Creek Greenway between Main Street and Vargrave Street is closed for construction of the Salem Creek Connector. The closure began in March 2014 and is estimated to be in place for 18 months.
    • More information about the detour is available on the Salem Creek Connector project page.
  • Salem Creek Connector Project           
    • Diggs Boulevard/South Martin Luther King Jr. Drive intersection is permanently closed as of January 2, 2014.
    • U.S. 52 interchange with Vargrave Street is permanently closed as of January 6, 2014.
    • Find out more on the Salem Creek Connector project page.

Road Closures

  • North Cherry Street (some lanes), Mast General Store construction site
    July 29, 2014
    A contractor has been given permission to close lanes on North Cherry Street to install an irrigation system water service line to the Mast General Store construction site. They will complete the work with alternating lane closures between the hours of 8:30 a.m. - 4:00 p.m. on Monday, July 28, 2014. At least one lane will remain open at all times. They expect to be able to complete the work in one day, weather permitting. UPDATE: The contractor was unable to complete the work on July 28, and work will continue on July 29, beginning at 9:00 a.m. The work is expected to be completed on the same day.
  • Yorkshire Road, Shoreland Road to Wellington Road
    July 29, 2014
    A contractor will be closing Yorkshire Road between Shoreland Road and Wellington Road to remove a tree on July 29, 2014, from 9:00 a.m. - 3:00 p.m., or until work is complete. Off-duty police will be redirecting traffic.

Sidewalk and Parking Closures

  • Old County Courthouse, North Main Street, North Liberty Street, West Third Street and West Fourth Street
    Beginning March 31, 2014
    The contractor redeveloping the old County Courthouse located between North Main Street, North Liberty Street, West Third Street and West Fourth Street will begin construction on Monday, March 31, 2014. Fencing will be installed around the site blocking the on-street parking and sidewalks. Signs will be installed advising pedestrians to use the sidewalks opposite the site.

Bike Facility and Sidewalk Updates 

Latest News

Posted: Friday, July 18, 2014
Streets Operations Division - July 18, 2014 Brandywine Road will be closed to through traffic between Sloan Drive and Densmo...
Posted: Friday, July 4, 2014
Streets Operations Division - July 3, 2014 The northernmost entrance and exit to Reynolda Village, across Reynolda Road fro...
Posted: Friday, June 13, 2014
Safe Routes to school May 2014 In This Issue ...
Posted: Tuesday, June 10, 2014
Transportation Department - June 10, 2014 The Salem Creek Greenway detour is being amended at Vargrave Street to avoid const...

Upcoming Events

MPO Technical Coordinating Committee Meeting 02/20/2014
Start Date/Time:
Thursday, February 20, 2014 2:00 PM
Recurring Event:
One time event
Description:

2:00 p.m., Bryce A. Stuart Municipal Building, 2nd floor

The Winston-Salem Metropolitan Planning Organization (MPO) Technical Coordinating Committee (TCC) will meet at 2:00 p.m. The meeting is held in the 2nd floor conference room of the Bryce A. Stuart Municipal Building.

Notify me of page changes

Receive E-Mail Notification When New Information is Posted on this Page
As a member, enjoy the benefits of MyCityofWS, including your choice of newsletters, and notifications about events and site updates. Login and Manage Your Subscriptions Now.

Toneq' McCullough
Director

Director's message

Location
Suite 307, Bryce A. Stuart
Municipal Building
100 E. First St.
Winston-Salem, NC 27101

Mailing Address
P.O. Box 2511
Winston-Salem, NC 27102

Citizen Notification System

City Link 311

Dixie Classic Fairgrounds Farmers Market