Utilities News

Elledge Plant Open House 11/15/2008The City-County Utilities Division will hold an open house and free tours of the Archie Elledge Wastewater Treatment Plant from 10 a.m. to 2 p.m. Saturday, Nov. 15. The open house will include information about plans to upgrade the plant.

Tours will start every 30 minutes and will include an overview of the wastewater treatment process and a tour of the Elledge plant and the new biosolids drying facility, which turns wastewater sludge into a pellet-size soil additive. Tours will depart from the Manson Meads Complex, next to the plant, at 2799 Griffith Road, Winston-Salem.

The Elledge plant began operating in 1956 and can treat up to 30 million gallons of sewage a day. Construction to build new primary clarifying basins is scheduled to begin by the end of November. The new basins will be at a higher elevation than the current basins and less susceptible to flooding from Salem Creek. A new control building and pump station will also be built. In all, the improvements will cost $51.9 million.

A map with directions is available - copy and paste "Open House Scheduled for Nov 15 at Elledge Plant" in the Search box and Go. Click the "Show on map" link.

For more information about the open house, call the Manson Meads Complex at 765-0130.

 

Actions: E-mail | Permalink |

City Link 311

see holiday collection schedule

Farmers Market