December 2022: The project’s design is complete and bid for construction. We anticipate construction for this project to begin in the Spring of 2023. Construction is expected to last about 5 months. Underwood Avenue will be temporarily closed to complete some of the work for this project. 

 

About the Project

The City was notified about the road sinking near the culvert structure near the intersection Northwest Boulevard. A culvert condition assessment report was provided to the City with the overall condition of the culvert and the repairs necessary to maintain a safe structure. This project will repair the existing concrete culvert structure by stabilizing foundations and provide adequate drainage system capacity. Other infrastructure such as pavement, concrete curb and sidewalk will be repaired and restored as part of the project.

Project Details

Project Type:              Drainage Improvement Project

Project Budget:           $890,000

Design Engineer:        Alpha and Omega Group

Contractor:                  To Be Determined

 

Schedule

 

Date 

Activity

Winter 2022

Project Design started

Fall 2022

Project Design Complete

To Be Determined

Construction Start

To Be Determined

Construction Completed

 

Contact Us

For more information on this project, email Mr. Todd M. Love, City of Winston-Salem Stormwater Division, or call 336-734-1318.