Leinbach Dr Culvert

Leinbach Drive Culvert Replacement 

Stormwater Capital Improvement Project 

 

About the Project 

The City is replacing an existing 72 inch drainage pipe crossing under Leinbach Drive between Avera Avenue and Countess Place. The metal pipe is severely deteriorated and showing signs of failure. The pipe conveys flow from a tributary to Muddy Creek adjacent the FEMA flood zone area. This project will replace the existing pipe with a concrete box culvert to provide more capacity. 

Project Details 

Project Type:        Drainage Improvement Project 

Project Budget:    $700,000 

Design Engineer:    KCA Associates 

Contractor:        To Be Determined 

 

Schedule 

 







Date  






Activity 






Fall 2023 





Project Design started 






Summer 2023 





Project Design Complete 






To Be Determined 





Construction Start 






To Be Determined 





Construction Completed 

 

Contact Us 

For more information on this project, email Mr. Todd M. Love, City of Winston-Salem Stormwater Division, or call 336-734-1318.